The Client IUS/SICUT, Middlesbrough The Brief As a result of relocating and expanding the business, manufacturer SICUT, based in Middlesbrough, required an upgrade of the power supply (from 400A to 2,800A) to provide power for new process machinery being installed for the manufacture of Composite Railway Sleepers. The Activity: As […]
Tag: Design
Electric Vehicle Charging Stations for Engineered Foam Products, Spennymoor
The Client Engineered Foam Products, Spennymoor The Brief To design and recommend electrical requirements, equipment and provide commissioning for 4 electrical vehicle charge points. The Activity: Previously known as DS Smith, Engineered Foam Products, based in Spennymoor, called on our long term working partnership for electrical design, installation and commissioning […]
LED Lighting Upgrade – St. Astier Ltd., Seaham
The Client LED Lighting Upgrade – St. Astier Ltd., Seaham The Brief A LED lighting upgrade for a substantial part of their business premises was the key requirement for our client. St Astier Ltd. needed the lighting to meet safe working lux levels but also wished to allow their employees […]
Electrical Upgrade at J.Mitchinson Ltd, Evenwood
The Client J.Mitchinson Ltd, Evenwood – Electrical Upgrade The Brief Our client, J Mitchinson Ltd., is involved in the manufacturing, production and assembly services for material handling equipment. On a recent site audit a production unit containing an aging electrical installation was noted as needing a full inspection and upgrade to meet the […]
Electrical Vehicle Charger – Hollin Applications, Wolsingham
The Client Hollin Applications, Wolsingham – Installation of Electrical Vehicle Charger The Brief To advise, provide an electrical supply design proposal, quote, installation and commissioning of 1 electrical vehicle charge point. The Activity: With the recent purchase of a Tesla vehicle, our client, Hollin Applications, required a dedicated electrical vehicle […]
Electrical Vehicle Charging Point Installation for Stone Technical Group
The Brief A conscious move by Stone Technical Group, building maintenance and groundwork providers, for their first order of electrical vehicles created a requirement for 4 charging points on-site. Tomlinson Longstaff were challenged with designing, sourcing, supplying, installing and commissioning the 4 charging points required. The Activity: Our first action was […]
Woodham Academy – LED Lighting Upgrade
The Brief A change in usage of a classroom required an improved lighting solution, in line with ongoing energy efficiency and cost saving targets. The Client Woodham Academy Secondary School, Newton Aycliffe The Activity: Woodham Academy have been engaged in a longer term project to save energy usage and costs […]
Etherley Lane Primary School – Classroom Lighting Upgrade
The Brief Two classrooms requiring faulty lighting repairs at Etherley Lane Primary School. The Activity: Our site assessment determined that the faulty lighting units were unable to be repaired due to faulty ballasts within the original light fittings. Due to budget constraints, two solutions were proposed; either replace the faulty […]
AO Logistics Case Study – LED Lighting Upgrade
The Brief As a long term client of Tomlinson Longstaff, AO Logistics called upon us to assess the distribution centre lighting and carry out repairs due to some recent issues resulting in ineffective and faulty lighting. The Activity: Once a site assessment had been completed by our engineer, it was […]
Cepac Case Study – Exterior Lighting Solution
The Brief To remedy poor lighting levels around the exterior of the site, reduce energy costs and address maintenance issues being experienced. The Activity: Calling on our long term service relationship, we were requested by Cepac to provide a solution for the exterior lighting on site to improve visibility, assess […]