Cepac Case Study – Exterior Lighting Solution

The Brief

To remedy poor lighting levels around the exterior of the site, reduce energy costs and address maintenance issues being experienced.


The Activity:

Calling on our long term service relationship, we were requested by Cepac to provide a solution for the exterior lighting on site to improve visibility, assess where energy cost efficiencies could be gained and reduce ongoing maintenance costs.

Having completed our site assessment, our project manager worked to produce a full exterior lighting redesign to upgrade the amenity lighting utilising long-life, high efficiency fittings which, in turn, would deliver maintenance and power cost savings.

Due to the activity on site, the Tomlinson Longstaff team worked out of hours to ensure that access was gained when the car park was empty to avoid any health & safety issues or disruption to site.

Cepac lighting work

The Result:

Completing the job on time and within budget, our solution resulted in greater lighting visibility across the exterior area thereby enhancing health & safety and security of the site, reduced operating costs by 40% and ensured a reduction in ongoing maintenance requirements and cost.

What the client said:

“A massive difference… excellent job”

– Paul Bellwood, Engineering Manager

Tomlinson Longstaff Ltd is an electrical contractor based in Country Durham, north east England. We offer a wide range of electrical services including design, testing, installation and maintenance.