The Client Stephenson Gobin, Bishop Auckland The Brief To carry out a 3 year regulatory EICR checks, assessment and issue report. The Activity: Our historical working partnership with manufacturers Stephenson Gobin, resulted in our team of approved electricians (those who hold an additional qualification in Inspection and Testing) visiting the Bishop […]
Industrial
Case studies detailing the solutions Tomlinson Longstaff have provided within the Industrial Sector
Facility Change of Use for United Powered Access
The Client United Powered Access, CA Group, Shildon The Brief Facility Change of Use: To fit out a newly acquired building to accommodate an expansion of business. The Activity: Our customer contacted us as a result of a works sticker that was on electrical distribution boards in a building that they […]
Installation of Three-Phase Heaters at a Mill in Durham
The Client Taylormade Timber, Durham The Brief To install 2 x 3-Phase heaters. The Activity: Employees are one of any organisation’s most important assets. In this case, it was discovered that the heating within the mill was not sufficient for the teams working in 2 identified areas. To ensure the […]
Electric Vehicle Charging Point Installation in Newton Aycliffe
The Client INEOS Compounds, Newton Aycliffe The Brief To install electric battery charging points for a forklift fleet. The Activity: Due to an upgrade in the forklift fleet established at the INEOS Compounds site in Newton Aycliffe, 6 x 32A 230V chargers were required to be installed at 4 varying locations across […]
Electrical Vehicle Charging Point Assessment in Dewsbury
The Client Whitetower Energy Ltd., Dewsbury The Brief To audit the electrical power supply to two electric vehicle charging points. The Activity: As part of an ongoing relationship with Whitetower Energy Ltd., usually working on the Seal Sands power station site, we were asked to visit a twin site in […]
Power Supply and Machinery Relocation in Bishop Auckland
The Client Stephenson Gobin, Bishop Auckland The Brief To make alterations to the current power supply to accommodate relocation of production machinery. The Activity: We champion our clients discovering new ways to become drive greater efficiency in their processes, and were delighted to be asked to support altering the power […]
Extension of Production Capacity for Biscuit International, Gateshead
The Client Biscuit International, Gateshead (formerly known as Northumbrian Fine Foods) The Brief To install a new three-phase distribution board and sockets for electrical power supply to a new production line. The Activity: As part of an ongoing long term relationship with Biscuit International (formerly Northumbrian Fine Foods), the commercial electrical team were […]
Adding a Power Supply to Site Access Gates in Bishop Auckland
The Client Stephenson Gobin, Bishop Auckland The Brief To install a power supply to the site access gates to enable automation. The Activity: Having worked with Stephenson Gobin, industrial electromagnet solution manufacturers, for some time we were delighted to be asked to design and install an upgraded power system to […]
New Electricity Supply Installation at Teescraft Engineering
The Client Teescraft Engineering, Alston Site The Brief To install an electrical power supply for a new production oven at an Alston warehouse. The Activity: In order to increase production output, an oven installation had been planned requiring a new electrical power supply to this engineering and fabrication site. Tomlinson […]
External Lighting Upgrade at CEPAC
The Client Loading Bay & External Lighting Upgrade for CEPAC, Darlington The Brief To replace & upgrade lighting solutions for the loading bay and perimeter of the industrial site. The Activity: With the previous lighting installations being out of date, in some places broken and irreparable, as well as costly […]