The Client Teesdale Toys, Barnard Castle The Brief To install electrical sockets, circuits and lighting for a shop refit. The Activity: They say that word of mouth referral is worth its weight in gold, and they’re not wrong. Having been referred to Teesdale Toys, we were invited to a shop […]
Commercial
Case studies detailing the solutions Tomlinson Longstaff have provided within the Commercial Sector
Rewire of Student Accommodation in Durham
The Client Ruth First House, Durham The Brief Rewire of 3 student accommodation houses. The Activity: In conjunction with a full multiple bedroom, kitchen and bathroom refurbishment for 3 houses of multiple occupation being carried out by T. Manners & Sons, Ltd., Tomlinson Longstaff were required to carry out a partial […]
Heating System Upgrade at Ferryhill Scout Hall
The Client Ferryhill Scout Hall, Co. Durham The Brief To replace the heating system for efficiency and effectiveness. The Activity: As a result of our excellent working relationship with an already established customer, we were invited to the Ferryhill Scouts HQ to assess, design and install a new heating system. The existing […]
Electrical Power Efficiency and Compliance in Durham
The Client Taylormade Timber, Durham The Brief To update an existing distribution panel and carry out regulatory testing on site. The Activity: Due to the demands on the electrical power supply to the Taylormade Timber industrial site in Durham, an update to one of the main electrical distribution rooms was […]
Emergency Hot Water Callout in Richmond
The Client Archers Ice Cream Parlour, The Station, Richmond The Brief To resolve an emergency call advising a lack of hot water. The Activity: Our customers always know that we will be on hand in times of emergency, and this was exactly the case when the staff at Archers Ice Cream […]
Retail Site Lighting Upgrade and Air Curtain at Eleganze
The Client Eleganze T/A Klass, Dalton Park, Seaham The Brief To replace existing lighting within the shop, changing area and shop window, and install an air curtain to the shop entrance. The Activity: After discovering Tomlinson Longstaff via Google, our client asked the team to assess and suggest replacement lighting for […]
Internal and External Lighting Upgrade at Northeast Bar
The Client Northeast Bar The Brief To replace and upgrade exterior and interior lighting for safety and efficiency. The Activity: The team took a call to support the refurbishment of a northeast bar in terms of lighting upgrades and replacements to increase the ambiance and provide extra safety and security […]
Fire Alarm System Extension for Teesside University
The Client Teesside University, Teesside The Brief Install new fire alarm devices to meet health and safety compliance as a result of a refurbishment of the library area. The Activity: We were invited by Teesside University, as a result of our long term working partnership, to support Pointer Fire Systems in installing an […]
CCTV Installation at Residential Flats
The Client T. Manners & Sons (Construction Company), Bishop Auckland The Brief To install a CCTV Camera System to a communal area of residential flats. The Activity: Our long term working relationship offered us the opportunity to work once again with T. Manners & Sons, this time to design and install […]
Full Design & Rewire of Lighting at the Shildon Civic Theatre
The Client Shildon Civic Theatre The Brief To design & rewire lighting in the hall to meet compliance and create financial savings. The Activity: A previous EICR inspection uncovered a number of failures in the wiring of the high-level lighting in the hall. This required addressing from a compliance aspect […]
