The Client Teesdale Toys, Barnard Castle The Brief To install electrical sockets, circuits and lighting for a shop refit. The Activity: They say that word of mouth referral is worth its weight in gold, and they’re not wrong. Having been referred to Teesdale Toys, we were invited to a shop […]
Tag: Case Study
External Lighting System Around School in Houghton Le Spring
The Client West Rainton Primary School, Houghton Le Spring The Brief To supply and install external lighting to school surroundings. The Activity: Having worked with West Rainton Primary School in the past, we were asked to supply and install 2 external floodlights to a yard area near the nursery provision attached to […]
Fire Alarm System Installation at University of Cumbria
The Client University of Cumbria, Lancaster The Brief To upgrade an existing fire alarm system. The Activity: With a sophisticated 75 point fire alarm system having been designed by CDS, we were invited to complete the system installation in the Hugh Pollard Lecture Theatre at the University of Cumbria, Lancaster. This was […]
Rewire of Student Accommodation in Durham
The Client Ruth First House, Durham The Brief Rewire of 3 student accommodation houses. The Activity: In conjunction with a full multiple bedroom, kitchen and bathroom refurbishment for 3 houses of multiple occupation being carried out by T. Manners & Sons, Ltd., Tomlinson Longstaff were required to carry out a partial […]
Heating System Upgrade at Ferryhill Scout Hall
The Client Ferryhill Scout Hall, Co. Durham The Brief To replace the heating system for efficiency and effectiveness. The Activity: As a result of our excellent working relationship with an already established customer, we were invited to the Ferryhill Scouts HQ to assess, design and install a new heating system. The existing […]
Installation of Three-Phase Heaters at a Mill in Durham
The Client Taylormade Timber, Durham The Brief To install 2 x 3-Phase heaters. The Activity: Employees are one of any organisation’s most important assets. In this case, it was discovered that the heating within the mill was not sufficient for the teams working in 2 identified areas. To ensure the […]
Solar Panels, Battery and Bird Protection in Ferryhill
The Client Lau Household, Ferryhill The Brief To install solar panels, storage battery and bird protection surround. The Activity: Due to the unfortunate occurrence of a flood in their home, Mr. & Mrs. Lau were required to remove their boiler and replace it with an alternative. Being forward thinking, they […]
Electric Vehicle Charging Point Installation in Newton Aycliffe
The Client INEOS Compounds, Newton Aycliffe The Brief To install electric battery charging points for a forklift fleet. The Activity: Due to an upgrade in the forklift fleet established at the INEOS Compounds site in Newton Aycliffe, 6 x 32A 230V chargers were required to be installed at 4 varying locations across […]
Electrical Power Efficiency and Compliance in Durham
The Client Taylormade Timber, Durham The Brief To update an existing distribution panel and carry out regulatory testing on site. The Activity: Due to the demands on the electrical power supply to the Taylormade Timber industrial site in Durham, an update to one of the main electrical distribution rooms was […]
Electrical Vehicle Charging Point Assessment in Dewsbury
The Client Whitetower Energy Ltd., Dewsbury The Brief To audit the electrical power supply to two electric vehicle charging points. The Activity: As part of an ongoing relationship with Whitetower Energy Ltd., usually working on the Seal Sands power station site, we were asked to visit a twin site in […]