Room Reconfiguration: St. John Bosco School, Sunderland

The Client

St. John Bosco School, Sunderland – room reconfiguration.

The Brief

St. John Bosco school were needing to reconfigure their library to create a dual use facility.

The client required the room to be divided into two in order that one part was transformed into a new SEND teaching area whilst the other part was to be updated but still retain its use as a school library. 


The Activity:

We collaborated with several of our long term partners, working alongside T. Manners & Sons Ltd, WMC Harvey Ltd consultants and Firepoint Ltd.

Our key role involved stripping out the old electrical installations then designing, installing and testing the new supply and lighting for the modernised dual use area.

The Result:

Our client was able to achieve a much better use of the existing space, now having both a modernised library and a new SEND teaching facility.

Much of the lighting was changed to energy efficient LED panels which not only save money and electricity use but also require far less maintenance and come with a 5-year warranty.

See more of our school case studies