A Full Solar Panel, Battery and Inverter Installation

The Client

Richard Ferrier, Richmond

The Brief

To install a full solar panel, storage battery and inverter solution.


The Activity:

Following a referral via one of our working partners, GRN Construction (thank you!) we were contacted with an enquiry for a solar power solution to be fitted to a domestic house and garage roof.

Following our initial home visit, we designed, installed and commissioned a 12 x Meyer Burger 385W panels across the house and garage roof, housing the 3.68kW Libbi solar power inverter and 5kWh storage battery in the garage.

All Myenergi products as well as the panels were supplied by our long term supply partner CCL Components, the Van Der Valk mounting system by Waxman Energy Ltd, and other electrical components by, also long term supply partner, City Electrical Factors.

Our thanks to BS Scaffolding Ltd. for their support in getting the team safely up & down the roofs to complete the job.

The Result:

With the solar power project being completed on time and in full, we are anticipating that the system will generate 3,710kWh of ‘clean’ electrical energy every year for our client, saving around 788kg of carbon, with an estimated annual saving of £1,200 a year.